New transmission infrastructure in Scotland is primarily required to transmit surplus electricity across the border into England and the wider Great Britain system
to where it is consumed, mainly Central Scotland and England. BBC Scotland’s insert into BBC Breakfast makes the above explicit claim that new pylons and infrastructure are needed to ‘shift’ energy from the north to central Scotland. Notably the full BBC Scotland report online does not make the above claim. Another Reporting Scotland special? https://www.bbc.co.uk/news/articles/c8rn42jp7d6o Is the claim, additional to their full online report, true? No. Why? In Scotland: Electricity consumption has declined substantially over the past two decades. Total consumption in Scotland was 21.7 TWh in 2024 — down 26.6% from the 2005–2007 baseline average of 29.3 TWh. Domestic … Continue reading New transmission infrastructure in Scotland is primarily required to transmit surplus electricity across the border into England and the wider Great Britain system
