
From the Alaska Beacon in July 2026, the above and:
A Louisiana shipbuilder is proposing to build a replacement for one of the workhorse vessels in the Alaska state ferry fleet. Thoma-Sea Marine Constructors LLC submitted a bid of about $350 million to build a replacement for the 62-year-old Tustumena, one of two ocean-going ships in the fleet, the Alaska Department of Transportation and Public Facilities said Tuesday.
62 year-old?
The media operating in Scotland often refer to a 30 year figure as a point at which ferries should be replaced and make much of the fact that 4 Calmac ferries are older than 30, one is 40 . https://www.bbc.co.uk/news/uk-scotland-61161932
If in Alaska, a 62 year-old ferry is only due to be replaced soon, does that suggest the 20 year target in Scotland is a bit unnecessary?
Well:
In British Columbia, a 60 year-old is being repaired to continue on their busiest route. https://cheknews.ca/queen-of-new-westminster-ferry-back-in-operation-after-lengthy-repairs-1244124/ and they’re running three at 49. https://en.wikipedia.org/wiki/List_of_BC_Ferries_ships
The 75 year-old SS Badger, built in 1952, is still operating on the Great Lakes (USA). https://www.aol.com/news/ss-badger-season-opens-may-162253664.html
